Treballs Fi de Grau> Enginyeria Química

Análisis de la red de agua y estudio de alternativas de optimización del consumo de agua.

  • Identification data

    Identifier: TFG:3355
    Authors:
    Casero Gené, Pau
  • Others:

    Creation date in repository: 2021-07-09
    Abstract: Este proyecto surgió de la necesidad de optimizar la red de agua de la empresa, puesto que ha crecido rápidamente los últimos años y no ha estado capaz de invertir el tiempo y los recursos necesarios para hacer frente a los problemas de la escasez de agua en situaciones de alta productividad. A tal efecto, se llevó a cabo un P&ID de las tres fábricas, la sala de calderas y la sala de agua. Actualmente, la empresa no dispone de esta documentación, razón por la cual esta tarea se ha llevado a cabo desde cero, realizando así un trabajo de campo que ha durado a lo largo del curso del proyecto. Una vez se llevó a cabo el P&ID, se identificaron todos los puntos de uso diario del agua y se calculó el consumo mediano diario de estos. Por otro lado, se comparó con la producción diaria mediana de la sala de agua. El balance final se llevó a cabo para determinar la relación de producción/consumo. Se observó que la producción de agua es bastante eficiente y no requiere de una mejora actualmente. Sin embargo, se han analizado los puntos de uso y se ha observado que el consumo de agua podría reducirse. Por esta razón, se presentan tres alternativas para mejorar el ahorro de agua. Después se llevó a cabo una evaluación económica, teniendo en cuenta la inversión necesaria para cada alternativa y el ahorro de agua que comportaría. Finalmente, se calculó el tiempo necesario para amortizar esta inversión y se aprobaron las tres alternativas propuestas. This project arose from the need to optimise the company's water network, as it has rapidly grown the last years and has not been able to invest the time and necessary resources to deal with the problems of water shortages in situations of high productivity. For this purpose, a P&ID of the three factories, the boiler room and the water room was carried out. The company does not currently have this documentation, which is why this task has been carried out from scratch, thus carrying out field work that has lasted throughout the course of the project. Once the P&ID had been carried out, all the points of recurrent water use on a daily basis were identified and the average daily consumption of these was calculated. On the other hand, it was compared with the average daily production of the water room. The balance was then carried out to determine the production/consumption ratio. It was found that the water production is efficiently enough and does not need to be improved by the moment. However, the points of use were analysed, and it was observed that there is water consumption that could be reduced. For this reason, three alternatives for improvement to save up water are presented. Next, an economic evaluation was carried out, considering the investment required for each alternative and the water savings that it would entail. Finally, the time needed to amortize this investment was calculated and three of the three alternatives proposed were approved. This project arose from the need to optimise the company's water network, as it has rapidly grown the last years and has not been able to invest the time and necessary resources to deal with the problems of water shortages in situations of high productivity. For this purpose, a P&ID of the three factories, the boiler room and the water room was carried out. The company does not currently have this documentation, which is why this task has been carried out from scratch, thus carrying out field work that has lasted throughout the course of the project. Once the P&ID had been carried out, all the points of recurrent water use on a daily basis were identified and the average daily consumption of these was calculated. On the other hand, it was compared with the average daily production of the water room. The balance was then carried out to determine the production/consumption ratio. It was found that the water production is efficiently enough and does not need to be improved by the moment. However, the points of use were analysed, and it was observed that there is water consumption that could be reduced. For this reason, three alternatives for improvement to save up water are presented. Next, an economic evaluation was carried out, considering the investment required for each alternative and the water savings that it would entail. Finally, the time needed to amortize this investment was calculated and three of the three alternatives proposed were approved.
    Subject: Aigua
    Language: spa
    Subject areas: Ingeniería química Chemical engineering Enginyeria química
    Department: Enginyeria Química
    Student: Casero Gené, Pau
    Academic year: 2020-2021
    Title in different languages: Análisis de la red de agua y estudio de alternativas de optimización del consumo de agua. Analysis of the water network and study of alternatives to optimise water consumption. Anàlisi de la xarxa d'aigua i estudi d'alternatives d'optimització del consum d'aigua.
    Work's public defense date: 2021-06-21
    Access rights: info:eu-repo/semantics/openAccess
    Keywords: P&ID, Ingenieria al detalle, evaluación económica P&ID, Detailed engineering, economic evaluation P&ID, enginyeria al detall, avaluació econòmica
    Confidenciality: No
    Title in original language: Análisis de la red de agua y estudio de alternativas de optimización del consumo de agua.
    Project director: Sanminiatelli Salas, Luca; Huesca Gracia, Carlos
    Education area(s): Enginyeria Química
    Entity: Universitat Rovira i Virgili (URV)
  • Keywords:

    Ingeniería química
    Chemical engineering
    Enginyeria química
    Aigua
  • Documents:

  • Cerca a google

    Search to google scholar