Identifier: TFG:382
Authors: Cañete Adell, Carles
Abstract:
Design and calculation of electrical installations to feed the industrial area of Tarragona Partial Plan 9 AUTOR: Carles Cañete Adell DIRECTOR: Lluís Massagués Vidal Carles.canete@estudiants.urv.cat Study Program The project is focused on design the necessary installations to operate the Partial Plan nº09 of the industrial estate of "Mongons". Specifically this PP-09 is located at the back of the “Floresta” neighborhood and the Carrefour mall. The PP-09 is composed of five blocks (A, B, C, D and E) with thirty-three plots passageways (A, B, C, D, E and H). The plots have different extensions, from 2.500 m2 the smallest one, up to 24.243 m2 the biggest one. The installations that will be projected are many: in one hand, high voltage power supply (25 kV) will be take it from CT-TA-24499 located in the park “Les Gavarres". Also 16 TC will be installed, to make the switch from High to Low Voltage. 5 of them, have a 630 kVA transformer, 10 of them TC have a 1,000 kVA transformer and the remaining TC has two transformers of 630 kVA. In the other hand, the Installation of Low Voltage that join the TC with each of the plots, is made by aluminum conductors with sections of 240 mm2 and 300 mm2. Finally, streetlight of PP-09, composed of 103 LED lights 90 W, which also have been added to each one the system CityTouch to manage by distance. Study Program: Degree in Electrical Engineering. Defense Date: September - 2015.