Treballs Fi de Màster> Enginyeria Mecànica

Diseño de una instalación modular de carga de cisternas para transporte por carretera de ácido nítrico

  • Datos identificativos

    Identificador: TFM:246
    Autores:
    Domosbian Engler, Jorge Martín
  • Otros:

    Palabras clave: INSTALACIÓN, CARGA, CISTERNAS INSTALLATION, LOAD, TANK INSTALACIÓ, CÀRREGA, CISTERNAS
    Título en diferentes idiomas: Diseño de una instalación modular de carga de cisternas para transporte por carretera de ácido nítrico Design of a modular tank loading system for road transport of nitric acid Disseny d'una instal·lació modular de càrrega de cisternes per a transport per carretera d'àcid nítric
    Áreas temàticas: Ingeniería mecánica Mechanical engineering Enginyeria mecànica
    Confidencialidad: No
    Curso académico: 2016-2017
    Estudiante: Domosbian Engler, Jorge Martín
    Departamento: Enginyeria Mecànica
    Fecha de la defensa del trabajo: 2017-09-14
    Creditos del TFM: 12
    Director del proyecto: De la Flor López, Silvia
    Resumen: Nitricomax, perteneciente al grupo MAXAM desde 2013, es una planta de ácido nítrico situada en La Canonja (Tarragona). Cuenta con una localización estratégica muy importante para el desarrollo de las operaciones globales del grupo en el mundo. De este modo, prevé ampliar sus instalaciones y aumentar su portafolio de producción, que le plantea una revisión del proceso de carga de cisternas, con el objetivo de reducir los tiempos de llenado, logrando así, una mayor eficiencia de los recursos logísticos. El objetivo principal del presente proyecto consiste en diseñar una instalación modular de carga de cisternas para transporte por carretera de ácido nítrico. La estación de carga ha de ser de tipo modular para establecer como estándar de operación de carga de cisternas en los diferentes centros productivos que MAXAM tiene en el mundo. De este modo, en función de las necesidades, considerar la posibilidad de instalar uno, dos o más estaciones de carga de cisternas. El análisis de la estación de carga existente dio como resultado la necesidad de realizar actuaciones de suma importancia con el fin de reducir los tiempos de tareas del proceso de carga de cisterna y aumentar la seguridad de la instalación: aumento de tamaño de líneas, instalación de brazos de carga, sustitución de bombas, nueva plataforma para acceso al nivel superior de la cisterna, etc. Finalmente, los beneficios debido a la implementación de las mejoras pueden analizarse en relación a la optimización del tiempo de trabajo del operador, hasta 40 mil euros anuales por línea de carga, y en relación al ahorro de energía producido por las bombas: un beneficio económico de 250 €/año asegurando un 70% más de capacidad de carga que el sistema actual. Nitricomax, part of the MAXAM group since 2013, is a nitric acid plant situated in La Canonja (Tarragona). It benefits from a strategic location, which is very important for the development of global operations within the group. Consequently, it is planning to expand its installations and grow its production portfolio, which implies the need to revise the tank filling process, with the aim of reducing filling times, hence achieving greater efficiency of logistical resources. The main objective of the current project consists of designing a modular tank filling installation to use to transport nitric acid by road. The filling station should be modular in order to be establish as standard operation for tank filling in the different MAXAM production centres around the world. Consequently, according to these needs, consider installing one, two or more tank filling stations. The analysis of the existing filling station resulted in the need for actions of paramount importance with the aim of reducing the time taken to fill the tank and to increase the security of the installation: increase the size of the lines, install loading arms, replace pumps, a new platform to access the upper level of the tank, etc. Finally, the benefits due to the implementation of the improvements can be analysed in relation to the optimisation of the working time of the operator, up to €40,000 per year per refill line, and in relation to energy savings achieved by the pumps: an economic benefit of €250 per year, securing a 70% higher capacity compared to the current system. Nitricomax, pertanyent al grup MAXAM des de 2013, és una planta d'àcid nítric situada a la Canonja (Tarragona). Disposa d'una localització estratègica molt important per al desenvolupament de les operacions globals del grup al món. D'aquesta manera, preveu ampliar les seves instal·lacions i augmentar la seva cartera de producció, que li planteja una revisió del procés de càrrega de cisternes, amb l'objectiu de reduir els temps d'ompliment, aconseguint així, una major eficiència dels recursos logístics. L'objectiu principal del present projecte consisteix en dissenyar una instal·lació modular de càrrega de cisternes per a transport per carretera d'àcid nítric. L'estació de càrrega ha de ser de tipus modular per establir com a estàndard d'operació de càrrega de cisternes en els diferents centres productius que MAXAM té al món. D'aquesta manera, en funció de les necessitats, considerar la possibilitat d'instal·lar un, dos o més estacions de càrrega de cisternes. L'anàlisi de l'estació de càrrega existent va donar com a resultat la necessitat de realitzar actuacions de summa importància per tal de reduir els temps de tasques del procés de càrrega de cisterna i augmentar la seguretat de la instal·lació: augment de grandària de línies, instal·lació de braços de càrrega, substitució de bombes, nova plataforma per a accés al nivell superior de la cisterna, etc. Finalment, els beneficis a causa de la implementació de les millores es poden analitzar en relació a l'optimització del temps de treball de l'operador, fins a 40 mil euros anuals per línia de càrrega, i en relació a l'estalvi d'energia produït per les bombes: un benefici econòmic de 250 €/any assegurant un 70% més de capacitat de càrrega que el sistema actual.
    Materia: Enginyeria mecànica
    Entidad: Universitat Rovira i Virgili (URV)
    Idioma: Castellà
    Enseñanza(s): Enginyeria Industrial
    Título en la lengua original: Diseño de una instalación modular de carga de cisternas para transporte por carretera de ácido nítrico
    Fecha de alta en el repositorio: 2017-10-06
  • Palabras clave:

    Ingeniería mecánica
    Mechanical engineering
    Enginyeria mecànica
    Enginyeria mecànica
  • Documentos:

  • Cerca a google

    Search to google scholar